Documents for Keyword: wharf construction
-
2019.011.1.51 D4 Cat caught in soft spot at shore-line while pushing over piling, etc. of old wharf.
-
2019.011.1.48 Gravel fill inside R.C. cantilever retaining wall.
-
2019.011.1.47 Foreman—Nick Oglow atop wall forms
-
2019.011.1.46 Westward end of footing work
-
2019.011.1.45 Ramp on inside of forms for pouring with power buggy
-
2019.011.1.44 Before removal of old wharf & cribbing.
-
2019.011.1.43 Wall Forms Near Completion
-
2019.011.1.42 Before removal of old wharf & cribbing.
-
2019.011.1.41 D4 Cat skidding old freight shed ashore
-
2019.011.1.40 1st Forms/Pile Bent Wharf
-
2019.011.1.39 Power Buggy Dumpin’/Pouring Footings
-
2019.011.1.38 Bottom End—Wall Forms
-
2019.011.1.37 Footing Forms
-
2019.011.1.35 Mixing Concrete
-
2019.011.1.34 New Freight Shed
-
2019.011.1.33 9′ wide footing 350′ long.
-
2019.011.1.32 Reinforcing in Forms for Footings (Note: Reinforcing is Suspended)