Documents for Keyword: Nakusp Hot Springs bridge
-
2024.14.39 Cross supports for decking being laid.
-
2024.14.37 Bridge over Kuskanax Creek with pipe running under deck.
-
2024.14.36 Bridge Finished. Tom Crockett, Cyl Cann.
-
2024.14.35 Log being strapped to line
-
2024.14.34 Both logs being levelled and secured
-
2024.14.33 Anchor holes being drilled
-
2024.14.32 Nakusp hot springs pipeline
-
2024.14.31 Log crossing Kuskanax Creek on clothes line 1973
-
2024.14.30 Bridge and pipeline 1973
-
2024.14.25 Logs for bridge beting set in place. Virgil Wethal.
