: 1 photograph : col. ; 15.2 x 10.1 cm on 21.6 x 27.9 cm matte
: Sidmouth Road under construction, new Shelter Bay residential development 10 km north of Shelter Bay ferry landing, mid-to-late 2010s. The image was taken as part of documentation of the Beaton Arm Crossing Association (BACA)'s proposed route (Option 8) for two fixed-link crossings of Upper Arrow Lake to replace the existing ferry. Sidmouth Road supplanted the previous Old Sidmouth Road, whose right-of-way was proposed by BACA to be used for a new highway alignment to connect the existing highway to the northern crossing.
Purchase Print
Purchased images are for personal use only and not for resale or redistribution. To obtain a licensing agreement please contact: [email protected].