: Group of miners posing for portrait inside tunnel during construction, tunnel connecting new Whatshan Dam to Whatshan hydroelectric station on Lower Arrow Lake north of Needles. Tunnel construction began in May 1948 and was completed 21 March 1951. Photo via Ken Stewart. Inscription accompanying photo set: 'Note the solid rock. That was blasted & drilled & mucked out & made ready for water. It's been quite a project. Too bad you couldn't have seen it while under operation. To Mum Dad Bob from Ken.'
Purchase Print
Purchased images are for personal use only and not for resale or redistribution. To obtain a licensing agreement please contact: [email protected].