Paddle steamer wheel

Arrow Lakes
Historical Society

2018.027.9.14 Upper Gate High Arrow 17.7.68

: 2018.027.9.14

: P25-12

:

: 1968-07-17 - --

: Wilf Hewat

: Wilf Hewat

: 1960s, Arrow Lakes flooding (Columbia River Treaty), BC Hydro, Columbia River, dam, dam construction, Hugh Keenleyside Dam, and Lower Arrow Lake

: Castlegar and Robson

:
1 colour slide (35 mm)

:
Upper lock gate under construction, construction of High Arrow Dam (later Hugh Keenleyside Dam), Columbia River west of Robson, 17 July 1968.

Purchase Print

Purchased images are for personal use only and not for resale or redistribution. To obtain a licensing agreement please contact: [email protected].

Paper

Print Size/Format

Digital

Print Size/Format