Documents for Creator: Nakusp & District Sports Centre
-
2006.011.31.11.1 Centennial Project
-
2006.011.31.9.3 Crews screen gravel to size in preparation for cement pour.
-
2006.011.31.9.2 Cement is pumped into building where crews use power skreeds to level and power trowels to smooth and polish.
-
2006.011.31.9.1 Crews busy installing plastic pipe and tying reinforcing mesh together.
-
2006.011.31.7.2 Jim Swan and Denis Desrochers
-
2006.011.31.7.1 Last of 4” x 4” sleepers installed.
-
2006.011.31.5.2 The first night of skating in the new Sports Centre attracts a large crowd.
-
2006.011.31.5.1 Crews install sidewall sheeting, insulation, and galvanized roofing.
-
2006.011.31.3.3 Crews raise an assembled truss into place.
-
2006.011.31.3.2 Crews assemble trusses and install joint hangers.
-
2006.011.31.3.1 First sod is turned by project chairman E. Harding