2022.024.003.8 Option Nine Crossing – Causeway and Bridge Crossing, 4.5 km

Accession Num: 2022.024.003.8

Negative Code:

Extent:

Document Date: 2015-- - 2018--

Donors: Beaton Arm Crossing Association

Creators: Earl Frerichs

Keywords: 2010s, BACA Option 9 (Upper Arrow Lake fixed link proposal), Mount Sproat, and Upper Arrow Lake

Locations: Galena Bay

Physical Description:
1 photograph : col. ; 15.2 x 10.1 cm on 21.6 x 27.9 cm matte

Notes:
View of Upper Arrow Lake looking north from between Albert Point and Galena Bay, ca. mid-to-late 2010s. The image was taken as part of documentation of the Beaton Arm Crossing Association's proposed route (Option 9) for a 4.5 km-long causeway/bridge fixed-link crossing of Upper Arrow Lake to replace the existing ferry that would emanate from this point. Mount Sproat at right.