2018.027.10.2 Canal Project Rock Cut – Corra Linn 25 May 75

Accession Num: 2018.027.10.2

Negative Code: P26-2

Extent:

Document Date: 1975-05-25 - --

Donors: Wilf Hewat

Creators: Wilf Hewat

Keywords: 1970s, BC Hydro, Corra Linn Dam, dam, dam construction, Kootenay Canal, and Kootenay River/Kootenai River

Locations: Blewett and Bonnington

Physical Description:
1 colour slide (35 mm)

Notes:
Newly-constructed rock cut adjacent to Corra Linn Dam between Bonnington and Blewett, BC Hydro's Kootenay Canal parallel to Kootenay River, 25 May 1975.