2018.027.10.1 Canal Project Corra Linn End, 25 May 75

Accession Num: 2018.027.10.1

Negative Code: P26-1

Extent:

Document Date: 1975-05-25 - --

Donors: Wilf Hewat

Creators: Wilf Hewat

Keywords: 1970s, BC Hydro, Corra Linn Dam, crane, dam, dam construction, Highway 3A, Highway 6, Kootenay Canal, and Kootenay River/Kootenai River

Locations: Blewett and Bonnington

Physical Description:
1 colour slide (35 mm)

Notes:
Construction on east end of BC Hydro's Kootenay Canal adjacent to West Kootenay Power's Corra Linn Dam (far left), Kootenay River between Bonnington and Blewett, 25 May 1975. Highway 3A/6 above river on hillside.