2014.018.427 Col Cel, Hydro moving office

Accession Num: 2014.018.427

Negative Code: S918C-1

Extent:

Document Date: 1968-09-07 - --

Donors: Denis Stanley

Creators: Denis Stanley

Keywords: 1960s, Arrow Lakes flooding (Columbia River Treaty), building relocation, Celgar (Columbia Cellulose/Canadian Cellulose), forestry, and Rothwell Point

Locations: Nakusp

Physical Description:
1 b/w negative (60 mm)

Notes:
Nakusp Celgar office being lifted from foundation in advance of rising waters caused by Hugh Keenleyside Dam, 7 September 1968.