2006.011.19.4.9 Moving Celgar office, 7 September 1968

Accession Num: 2006.011.19.4.9

Negative Code: Q19-9

Extent:

Document Date: 1968-09-07 - --

Donors: Doreen Desrochers

Creators: Doreen Desrochers

Keywords: 1960s, Arrow Lakes flooding (Columbia River Treaty), building relocation, Celgar (Columbia Cellulose/Canadian Cellulose), forestry, and Rothwell Point

Locations: Nakusp

Physical Description:
1 colour negative (35 mm)

Notes:
Celgar’s Nakusp office being moved to new location uphill across Highway 6 in advance of rising waters of Upper Arrow Lake to be caused by Arrow Dam (Hugh Keenleyside Dam), Rothwell Point, Nakusp, 7 September 1968.